Sign In | Join Free | My frbiz.com |
|
Brand Name : ZHENHENG
Model Number : Electric Concrete Pump
Certification : SGS, ISO, BV, CE
Place of Origin : HENAN CHINA
MOQ : 1 set
Price : Negotiation
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 30 sets per month
Delivery Time : 7-15 working days after confirm order
Packaging Details : Export standard container: 20GP or 40GP, 40HC
Model : HBTS50-13-55
Capacity : 50m3/h
Main oil pump : Kawasasi / Rexroth
Maximum aggregate size : 50mm
Concrete slump range : 120-230mm
Colour : Brown or Yellow
Application : Construction
After-sales service provided : Online support
Brief Introduction to 50m3/H Electric Concrete Pump
On the basis of mature electric commutation technology,we have developed overall hydraulic concrete pumps with excellent performance. It greatly improves the reliability of the machine and makes sure it can work in any hard condition. Our various motor concrete pumps( diesel engine concrete pumps) mainly cover capacity from 30-120m³/h and pressure from 5-20Mpa.
HBT50 has maximum output of 50 cubic meter per hour, equipped with the unique hopper and blade design, so as to less material left and easy to clean. It can adapt to a variety of concrete formulation. Good maintainability, easy to repair and disassemble.
Parameters of 50m3/H Electric Concrete Pump:
Item | HBTS50-13-55 |
Max Theoretical Concrete Output (m3/h) | 50 |
Max Theoretical Conveying Distance (vertical Height/Horizontal Distance) (m) | 800/200 |
Max Concrete outlet Pressure (Mpa) | 13 |
Distribution Valve | S Valve |
Max Aggregate size(mm) | 40 |
Concrete Slump(mm) | 100~200 |
Concrete Cylinder Diameter(mm) | φ200×1050 |
Oil Tank Diameter(mm) | φ125×φ80×1050 |
Hopper Capacity/Filling Height (m3/mm) | 0.5/1400 |
Concrete Pumping Pressure (Mpa) | 30 |
Hopper Mixing Pressure(Mpa) | 13 |
Oil Tank Capacity (L) | 200 |
Cleaning Mode | High Pressure Washing |
Motor (kw) | 55 |
Oil Pump (ml/r) | 140(Korea KAWASAKI) |
Valve group | Germany Bolseen |
Hydraulic Hose | Italy MANULI |
Electric | CHNT/Schneider |
Dimension (L×W×H)(mm) | 4590×1980×2100 |
Weight (kg) | 4500 |
Features to 50m3/H Electric Concrete Pump:
1. The distribution valve adopts the advanced S pipe valve system, good sealing performance; the structure is simple and reliable, and convenient replacement of the wearing parts;
2. High absorption optimize the hopper structure, improve the regional structure inside of the hopper which affects the suction performance;
3. Mixing blade with unique design and few deal space so it can be adapted to a wide range of concrete formula;
4. The main electrical components are imported, they fully guarantee the electrical control system of high reliability;
5. Perfect maintainability and dismantling of all wearing parts are very convenient.
| 1. Hydraulic system
| |
2. Electric control system
| | |
| 3. Mechanical system
| |
4. Cooling system
| |
Advantages of 50m3/H Electric Concrete Pump:
I. Agitation by the entire shaft axis design, embolization motor, strictly ensures the coaxial.
II. 50 cubic meters of mini concrete pumps and pipeline spare parts are assembled through assembly line production, and the process is strictly controlled to ensure its high quality.
III, good sealing performance; simple and reliable structure, easy replacement of wearing parts.
VI. Trailer concrete pump dual-circuit open-circuit hydraulic system ensures fast direction change and high efficiency
V. The distribution valve uses an advanced S-pipe valve system, which is composed of hard alloy spectacle plate, cutting ring and rubber spring.
Q1.: Are you trading Company or Factory?
A: We are factory. We have been engaged in the production of concrete pump for more than 30 years.
Q2: What is the capacity of your concrete pump?
A: We have 30m-100m3/h.
Q3: How long and high you want to pump?
A: We can provide 2 floors to 30 floors. Please let us know the vertical and horizontal delivery distance should reach. Or please let me know the tall building's total height.
Q4: The aggregate size that you usually use?
A: Pebble 40mm, 50mm, crushed stone 30mm.
Q5 : Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passports.
![]() |
50m3/H Electric Concrete Pump Images |